{"id":4269,"date":"2020-03-26T16:29:07","date_gmt":"2020-03-26T14:29:07","guid":{"rendered":"http:\/\/www.maweresibanda.co.zw\/?p=890"},"modified":"2020-03-26T16:29:07","modified_gmt":"2020-03-26T14:29:07","slug":"covid-19-can-a-party-invoke-force-majeure-clauses-to-escape-a-contract","status":"publish","type":"post","link":"https:\/\/jambodesigns.co.zw\/ms\/2020\/03\/26\/covid-19-can-a-party-invoke-force-majeure-clauses-to-escape-a-contract\/","title":{"rendered":"COVID-19: can a party invoke force majeure clauses to escape a contract?"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">News of COVID19 shocked the world when on New Years\u2019 Eve it was reported that the virus had been detected in a region in China. Since then, it has spread to over 93 countries. Lockdowns and other restrictive impacts which arose as a result of COVID 19 no doubt can have a dilatory effect on power construction contracts. Construction delay claims therefore may arise where such events compromise <em>the critical path<\/em> of a construction project. The <em>critical path<\/em> is a term used in construction parlance to refer to the path on the construction programme which shows the dates when certain activities must be completed by in order to achieve completion by the specified date. The construction program should be adhered to as there are time frames to be complied with as specified in the Power Generation Licence and the Power Purchase Agreements (PPA).&nbsp; <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the midst\nof this global crisis, parties to any construction contract, that is the\nemployer and contractor, should revisit their contracts, to understand the nature\nand extent of a <em>force majeure <\/em>clause if it is at all included and to\ndetermine if there can be an extension of time, a claim for damages or other\nrecourse. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Construction contracts and the power sector <\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In energy\nprojects, the Engineering, Procurement and Construction (EPC) is quite critical\nto a project\u2019s success. An EPC contract generally covers project management,\nsite management and supervision, engineering, materials and equipment, works,\nfoundation and site infrastructure works, installation, and commissioning of\nthe power plant. In Zimbabwe, most projects rely on experienced EPC contractors\nfrom China and Europe. Oftentimes, they bring in their experienced engineers\nand technicians from those regions to carry out the works. With the advent of\nCOVID 19 and movement restrictions, this becomes a problem. The question is\nwhether or not the lockdowns and other adverse measures emanating from COVID 19\ncan be classified as an act of God of force majeure for the purposes of\nconstruction contracts. If so, what can be done about such?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>What is force majeure?<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A <em>force majeure<\/em> or an Act of God is defined\nas generally including &#8220;risks beyond the reasonable control of a party,\nincurred not as a product or result of the negligence of the afflicted party,\nwhich have a materially adverse effect on the ability of such party to perform\nits obligations\u201d. Zimbabwe applies a common law system to force majeure and will only\napply it in cases where it is identified in a contract.&nbsp; <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Force majeure in FIDIC contracts<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In standard\nconstruction contracts such as General Conditions of Contract (GCC) and the International\nFederation of Consulting Engineers (FIDIC) Rainbow Suite (that is the Red Book,\nYellow book and Silver book) <em>force\nmajeure<\/em> is more commonly framed as an exceptional event or circumstance. Globally,\nmost international investors prefer the International Federation of Consulting\nEngineers (FIDIC) construction contracts. This is because it is endorsed by the\nWorld Bank and is generally acceptable worldwide. In these contracts, although a\nlist is provided of what may constitute a <em>force\nmajeure<\/em>, the list is not exhaustive and is vague enough to cover events\nlike COVID\u201319. In any case, COVID\u201319 may be viewed as a natural catastrophe\nbeyond a party\u2019s control. It has been argued that such a clause is vague on the\n\u201cwhat\u201d question. However, the four gate keepers included in most standard\nconstruction contracts particularly FIDIC offer an effective filter of what can\npass as a <em>force majeure<\/em>: <\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>Must\nbe beyond a party\u2019s control<\/li><li>Such\nparty could not have reasonably provided against it prior to entering the\ncontract.<\/li><li>Which\nhaving arisen, such party could not reasonably have avoided or overcome and<\/li><li>Which\nis not substantially attributable to the other party. <\/li><\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">A clause drafted\nin this manner is less concerned about the event itself but rather the real\nimpact of the event on the parties\u2019 ability to perform. Whatever the event may\nbe it must pass the test above.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Interpretation of force majeure clauses \u2013 the Seadrill\nGhana Operations Case <\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Force majeure <\/em>provisions are\nusually construed strictly such that if there is ambiguity the <em>contra\nproferentem <\/em>rule will apply. <em>Contra proferentem <\/em>means that the\nclause is interpreted against the interests of the party that drafted and is\nseeking to rely on it. . In the\npresent circumstances, a party must prove\nthe extent COVID \u201319 prevented them from performing their obligation whether in\nwhole or in part. This\ntherefore creates a cumbersome task for a party that bears the burden of proof\nand that seeks rely on it &nbsp;In simple terms it must clearly be shown that\nthe virus caused the failure to perform.&nbsp;\nThe case of <em>Seadrill\nGhana Operations Ltd v Tullow Ghana Ltd <\/em><em>[2018] EWHC<\/em> shows that courts not\nonly look at an event as a cause but rather <em>the\n<\/em><strong><em>effective<\/em><\/strong><em> cause<\/em>\nof the failure to perform.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the\nreason that, a third of the global supply chain depends on Chinese factories,\nthe construction industry has been adversely affected. Without attempting to be\nexhaustive, some probable effects in the construction and energy industry are\nlabour shortages due to ongoing lockdowns. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Back home \u2013 COVID 19 and force majeure&nbsp; <\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our fragile\nhealth system poses COVID \u201319 as a real threat should the virus touch base in\nZimbabwe. Parties may further experience hindered decision making as primary\ndecision makers may be required to undergo quarantine after travel overseas. A practical\nexample is the travel warnings given by the President recently.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Again,\nwithout exception to Zimbabwe, faced with supply shortages, parties may face\nchallenges with their construction endeavours which will cause significant\ndelays in a project and ultimately their ability to complete a project on time.\nA contractor in this predicament is exposed to <em>liquidated damages<\/em> in projects where time is of the essence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Causation challenge <\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, as\nmentioned above despite the impact of COVID19, real or imagined, invoking force\nmajeure requires a solid evidence of causation. For this reason, courts may not\neasily be convinced that Covid-19 inhibited performance. &nbsp;Another party may allege that the failure to\nperform was caused by a more significant underlying issue other than the\neffects of the virus. &nbsp;It may also be\nargued that because the virus broke out on the 31<sup>st<\/sup> of December\n2019, a party particularly contractors had ample time to anticipate the effects\nof the virus on their works and adequately prepare. A contractor anticipating a\nfundamental hindrance in performing their obligation may need to revisit the <em>force majeure<\/em> clause because in light of\nboth sides of the argument the gap to invoke COVID19 might be constricted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On the\nother hand, while a contract may create a possible excuse for a party through\nforce majeure, there remains procedure. This is why the importance of\nrevisiting the contract cannot be overemphasised. The preferred approach for a\nproject company is to define <em>force majeure <\/em>events as being any of the\nevents in an exhaustive list set out in the contract. In this manner, both\nparties are aware of which events are <em>force majeure <\/em>events and which are\nnot. However, this is not always the case such as unexpected eventualities can\narise.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>The notice requirement \u2013 need for promptness <\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the case\nof the FIDIC Rainbow suite, the party raising a <em>force majeure<\/em> must give notice to the other party. &nbsp;A closer look at the language used shows the\npresent and future tense, with an effect that the event must be presently\noccurring or be anticipated. This clear language shows a contractor runs the\nrisk of incurring liability if notice is given long after the event has occurred.\n<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To be more\nprecise there is a time bar for giving notice as 14 days from the date a party\nbecomes aware or the time the party should have been aware of the event. The\nneed to predict impact is one that parties in projects need to consider in\ntheir decision making concerning this global crisis.&nbsp; <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Duty to minimize damage \u2013 the Classic\nMaritime Inc case<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lastly\nthere is always a common law duty whether included in a contract or not, to\nminimize the possible damage incurred by either parties.&nbsp; Recently, in <em>Classic\nMaritime Inc v Limbungan Makmur SDN BHD and Another<\/em> it was clarified that a\ncontract does not necessarily need to have a clause requiring a duty to take\nreasonable steps because the common law imposes an obligation to mitigate the\neffects of a force majeure.&nbsp; FIDIC contracts explicitly provide for this\nduty by particularly requiring parties to \u2018use reasonable endeavours to\nminimise any delay in performance\u2019. &nbsp;Thus\nin the wake of the virus parties need to be proactive in their efforts to\ncontain the effects of COVID\u201319.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Way forward <\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Force majeure <\/em>events are a phenomenon of life. Though their occurrence is unexpected, they are to be expected. The excitement of signing a contract must not blind parties from adequately accounting for risk which include outbreaks like COVID19. With the majority of critical factories worldwide under shutdown and the rest of the globe following, parties to projects must without delay revisit their <em>force majeure<\/em> clauses. As noted above, the contractor can be entitled to an extension of time if a <em>force majeure <\/em>event impacts on its ability to perform the works. Some contractors also request costs if a <em>force majeure <\/em>event occurs though this is undesirable. COVID 19 amounts to a <em>force majeure <\/em>which ought to be set out as a neutral risk as it is not in the control of either party. In such circumstances, each party ought to bear its own costs. With COVID 19, a substantial haircut is expected in the energy sector.&nbsp; &nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>This article has been provided for informational purposes only. For legal support on how to manage contracts in response to COVID-19, please contact our <a href=\"https:\/\/jambodesigns.co.zw\/ms\/team-members\/godknows-nyangwa-2\/\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"Corporate Advisory (opens in a new tab)\">Corporate Advisory<\/a> team.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>News of COVID19 shocked the world when on New Years\u2019 Eve it was reported that the virus had been detected in a region in China. Since then, it has spread to over 93 countries. Lockdowns and other restrictive impacts which arose as a result of COVID 19 no doubt can have a dilatory effect on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":898,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[83],"tags":[36],"class_list":["post-4269","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-covid-19-client-support","tag-zimbabwe-lawyer"],"_links":{"self":[{"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/posts\/4269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/comments?post=4269"}],"version-history":[{"count":0,"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/posts\/4269\/revisions"}],"wp:attachment":[{"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/media?parent=4269"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/categories?post=4269"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jambodesigns.co.zw\/ms\/wp-json\/wp\/v2\/tags?post=4269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}